翻訳と辞書
Words near each other
・ Pilifer
・ Piligalla
・ Piligama
・ Piligrim
・ Pilihan FM
・ Pilihudugolla
・ Pilihudugolla Ihalagama
・ Pilihudugolla Pahalagama
・ Pilikaaiea
・ Pilikambi Rural LLG
・ Piliki
・ Pilikula Nisargadhama
・ Pililaau Army Recreation Center
・ Pililaelaps
・ Pilili
Pililla Wind Farm
・ Pililla, Rizal
・ Pilimathalawa
・ Pilimini
・ Pilimpikou Department
・ Pilimyia
・ Pilin
・ Pilin Tachakittiranan
・ Pilina
・ Pilina solarium
・ Pilina unguis
・ Pilinella
・ Piling Bay
・ Piling-up lemma
・ Piliny


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Pililla Wind Farm : ウィキペディア英語版
Pililla Wind Farm

The "Pililla, Rizal" Wind Energy Service Contract granted to Alternergy Philippine Holdings Corporation (APHC) covers an area of 4,515 hectares〔(【引用サイトリンク】url=http://www.alternergy.com/pp.php?id=32 )〕 under Department of Energy WESC NO. 2009-09-018. This Wind Energy Service Contract (WESC) has two phases, Pililla Wind Power Project under WESC NO. 2009-09-018-AF1 and the Mt. Sembrano Wind Power Project under WESC NO. 2009-09-018-AP2.〔(【引用サイトリンク】url=http://www.doe.gov.ph/feed-in-tarriff-monitoring-board/with-certificate-of-confirmation-of-commerciality/doc_download/1272-wind-projects-under-fit-system-as-of-january-31-2015 )
In December 2008, Alternergy Philippine Holdings Corporation (APHC) was awarded by the Department of Energy (DOE) the exclusive right to develop wind power projects in 3 locations: Pililla in Rizal, Abra de Ilog in Occidental Mindoro, and Kalayaan, Laguna. These locations were among those identified under the Philippine Wind Atlas as potential sites for wind farms due to good to excellent wind resources. APHC was subsequently awarded additional wind energy service contracts in 3 other locations in 2009. APHC is committed to implement the wind projects if the wind measurements and site specific studies demonstrate that the power plants are commercially viable.〔(【引用サイトリンク】url=http://www.adb.org/sites/default/files/project-document/42996/44295-012-tcr.pdf )
Phase 1 of this project is a wind farm in Barangay Halayhayin in Pililla, Rizal, Philippines. The wind farm is being undertaken by Alternergy Wind One Corporation.〔(【引用サイトリンク】url=http://news.pia.gov.ph/article/view/2261425455273/construction-of-rizal-wind-farm-power-project-in-full-swing )〕 The total cost for the construction of the wind farm is US$177.9 million.〔(【引用サイトリンク】url=http://www.doe.gov.ph/doe_files/pdf/01_Energy_Situationer/2014-Private-Sector-Initiated-Power-Projects-Luzon%20Committed.pdf )
The project consists of 27 wind turbine generators grouped into three clusters with aggregate capacity of 67.5 megawatts (MW). The said project, after completion will interconnect to Meralco’s Malaya-Teresa 115 kilovolts (KV) transmission line located just 10 kilometers from the project site.〔(【引用サイトリンク】url=http://news.pia.gov.ph/article/view/2261425455273/construction-of-rizal-wind-farm-power-project-in-full-swing )
Phase 2 located in Pililla, Rizal and Mabitac, Laguna was not initially included by Alternergy Philippine Holdings Corporation (APHC) in the Technical Assistance (TA) from the Asian Development Bank. A minor change in the ADB TA implementation was approved in February 2013 to prioritize the development of the Pililla, Rizal wind farm site and expand the study to Pililla Stage 2, which covers the southern portion of the area, as initial findings showed certain limitations in wind resource and constructability in the Laguna and Occidental Mindoro sites. Construction of a wind power project in Abra de Ilog, Occidental Mindoro, in particular, is not feasible until either the National Grid Corporation of the Philippines or the Philippine government has installed a submarine cable connecting Mindoro and Luzon. Based on the initial findings, further studies on the Laguna and Mindoro sites were discontinued; unutilized TA budget for these sites were reallocated instead to fund the study for Pililla Stage 2.〔(【引用サイトリンク】url=http://www.adb.org/sites/default/files/project-document/42996/44295-012-tcr.pdf )〕 The projected cost for Phase 2 is Php 7.056 Billion and its planned output is 72 megawatts (MW).〔(【引用サイトリンク】url=http://www.doe.gov.ph/doe_files/pdf/01_Energy_Situationer/2014-Private-Sector-Initiated-Power-Projects-Luzon%20Indicative-September-30.pdf )
==References==



抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Pililla Wind Farm」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.